At Power Damper Services we have maintenance contracts in place with many of the UK & Norwegian gas & oil companies for platforms throughout the North Sea. A collection of case studies can be viewed below.



Alba (North Sea - UK Sector) Platform

Alba UK SectorWe were invited to the platform for an initial survey regarding the future integration, reliability & longevity of their WHRU and associated control isolation dampers. Although the existing WHRU and casings were serviceable the inlet, bypass & isolating dampers, and controls, needed a complete overhaul. Due to previous safety issues, the operators had lost confidence in the original arrangement & new dampers were therefore requested. However, since the dampers were an integral part of the WHRU, the whole WHRU had to be changed.

Read more...
 

Troll C (North Sea - Norwegian Sector) Platform

Troll C Norwegian SectorWe were invited to the platform to investigate operational WHRU diverter problems, It was apparent the Flap type diverter was not suitable for the application that it was being used for, ie, controlling low amounts of exhaust gas through the WHRU.

Read more...
 

Jotun A (North Sea - Norwegian Sector) FPSO

Jotun AWe were invited to the FPSO to investigate operational WHRU diverter problems. It was apparent that the existing Diverter manufacturer had ceased trading and was untraceable. However, our recommendations were for complete overhauls of both units.

Read more...
 

CNR (North Sea - UK Sector) Platform

CNRPower Damper Services was approached to advise why their operators were continually having problems & down time with the dampers on their GT system. It was immediately apparent they were using the dampers for a completely wrong application.
Read more...
 

NPS – Onshore

Cyprus_resizedFollowing an explosion near to a GT Power Generation Plant in Cyprus, Power Damper Services were invited to prepare a detailed report relating to the future suitability of safe generation after the explosion had severely damaged most of the plant equipment.

Read more...